Posts

Sorted by New

Wiki Contributions

Comments

With regard to the building example and concurrent design/construction, we see this method frequently with design-build delivery projects. Unfortunately, in many cases the need for assigning financial accountability results in the usual layers of bureaucracy and slowing of the process (shop drawing reviews, etc.). IPD (integrated project delivery) attempts to solve this, and does in many ways, but is very cumbersome to set up, and is therefore effective on only very large projects. In order to take the risks inherent with concurrent design and construction, the "owner" has to be willing to fail (at least in small ways). 

An aside, we tout BIM (building information modelling, usually using Revit) as a solution for better coordination and smoother construction, when it usually results in the opposite, due to increasing project complexity. Making the building simple, with repeated components (the window example was a great one) is a better answer. 

I really enjoyed this article. As a practicing structural engineer and manager, there are lots of take-aways that can help me and my team do better. Great summary and linking of the various programs.